|
Mandate
- Demonstrate increased awareness,
integration and adoption of GE/SE analysis and solutions by stakeholders.
Current
Status
- Awareness raising in pilot
villages and monitoring of demo sites
- Development of Matrices
of GE/SE mainstreaming
- Developing training content
and workshop structures for Project level GE/SE events
- Networking with related
initiatives.
GE/SE
Critical Success Factors
|
*
Ensuring Accessibility
|
*
Assessing Reliability
|
-
Physical Access
|
-
Field Presence
|
- Location of PTIC
- Timing
- Multiuse of PTIC
|
- Selection & ongoing
orientation
- Sustained presence and reporting
- Sharing feedback from user
communities with other work streams
|
| -
Economic Access |
-
User Evaluation & Interface
|
- Selection of PTIC operator
- Capacity building of PTIC
Operator & Users
- Need based Services
|
- Usage at PTIC
- Services of PTIC, LSP, BSNL
- Environment and Capacity
of PTIC
|
GE/SE
Sustainability Issues
- Project time frame for implementation;
Short social inclusion parameters require a minimum of three years
in the short term to assess any demonstrated outputs.
- Sustained presence of GE/SE
input at project and field level needs to be institutionalized.
- Facilities and Services
at the PTIC could be staggered for better access and reliability
factors for women and disadvantaged groups
|